North hall, after power washing
Viewed: 250 times.
|
North hall, after Eurotec coating
Viewed: 268 times.
|
Front hall pillar before
Viewed: 218 times.
|
Front hall pillar after Eurotec coating
Viewed: 211 times.
|
East wall, cleaned
Viewed: 204 times.
|
Windows and wrecker bars wrapped and protected
Viewed: 199 times.
|
East wall after Eurotec coating
Viewed: 195 times.
|
Terrace protected ready for coating the balustrade
Viewed: 201 times.
|
You can see the protection on windows and roof tiles
Viewed: 187 times.
|